Oil & Gas projects

Oil and Gas Skills Co.

Competency Assurance Management System
  • Supply Experienced Training Engineers to perform the training activities of ZOHR Gas Plant
  • Project under the supervision of (ENI and PETROPEL)
  • Prepare the Training Material
  • On Job Training

SEGAS LNG Company

Provision of construction for metering feed gas bypass line from 3 to 12 inch at SEGAS LNG plant, DAMIETTA, EGYPT

Piping fabrication with certified GTAW and SMAW welders, Fabrication/testing and erection of pipe racks and steel structure piping support, blasting/painting application and subsequent painting inspection (profile, WFT, DFT and holiday), civil work of concrete foundation, NDT nondestructive testing (radiographic and MPI), piping pneumatic testing and Instrumentation devices installation

SEGAS LNG Company

PROVISION OF EPC ACTIVITIES OF FIRE PROTECTION SYSTEM FOR TELECOMMUICATION & SERVER ROOMS (PFCN173)
  • Engineering, Supply, Install and Commissioning of VESDA (Very Early Smoke Detection Aspiration System) For IT rooms in Company CCR Building.
  • Engineering, Supply, Install and Commissioning of Honeywell Fire Suppression Panel (Fire-Lite Mrp2002E), smoke detectors, Horns, Alarm Bells and Manual Call Points for IT rooms in Admin Building and CCR.
  • Engineering, Supply, Install and Commissioning of FM200 System for IT rooms in Admin Building and CCR.

SEGAS LNG Company

THE PROVISION OF PC INSTRUMENTATION ACTIVITIES OF GAS DETECTION SYSTEM MODIFICATION (PFCN058A)

PC activities (Procurement and Construction) for adding new gas detectors (point IR and open path) Total 64 Gas Detectors in SEGAS plant.

The scope of works was included all operations deemed as necessary for the execution of all the works and services necessary to add the new gas detectors and connect their signals to SEGAS F&G system.

Supply, Install and Commissioning of Gas Detectors in the LNG (Liquefied Natural Gas) train in Damietta (Open path and Point IR types) Supply and Installed all Cables, Cable Trays and Supports for Instruments.

Khalda Petroleum Company

EAM & Asset Management Project (AMP) implementation project.

Implementation of CMMS (Computerized Maintenance Management System) for all the 9 of Khalda Oil and Gas Sites. The project scope is to collect the assets manufacturing and design Engineering data and create the Maintenance activities, tasks for PM and Related MTO, eAM loading steps, eAM reliability Excellency process implementation, planning process implementation and Action register.

PHARAONIC Petroleum Company

Sub-Contractor with Global Technical Services
  • Gap Analysis study and develop a new Hookup for the field instrumentation and hydraulic systems for the three gas plant onshore and offshore (Ha'py Offshore, Akhen Offshore and Ha'py / Turt Onshore Plants)
  • Supply all the project MTO
  • Change the Hookup tubes & fittings of field instrumentation, Control valves and ESD Valves. For the ONSHORE and OFFSHORE facilities.
  • Change the Instrument air Headers from Carbon steel to SS 316
  • Modify the defected and wrong Installation
  • Leak test Calibration and commissioning.

SEGAS LNG Company

TIE IN building FAP to plant F&GS complete with all related civil works. Supply Install and Commissioning of F&G control panel and all related detectors

PETROBEL Petroleum Company

Supply install and Commissioning of MCC & control panels

PETROGULF Petroleum Company

Asset Integrity Management System (AIMS) Gap analysis and Base line report, Subcontracted from Oil and Gas Skills OGS

South DABAA Petroleum Company

MCC & control panels

MAGAWISH Petroleum Company

MCC & control panels.

QARUN Petroleum Company

MCC & control panels.



Industrial Projects

Nile Establishment for International Trades

Toukh Refrigeration Plant Phase 2 ( Km 180 Agriculture Alex Road)
  • Infrastructure work for medium voltage network (11 KV) 4 KM of 300mm MV cables and 2.5 MVA transformer & RMU .
  • Low voltage network including cables, Low tension MDB and SMDB and Control Panels.
  • Power Earthing Network, Low Current Earthing Network
  • Lighting System
  • Low Current System Including, CCTV, Fire Alarm, Telephone, Data System, Public address.
  • 1.5 MVA Emergency Power Generator

Food Bank

Warehouse and Logistic Hub project at Badr City
  • Low voltage network including cables, Low tension MDB and SMDB and Control Panels.
  • Power Earthing Network, Low Current Earthing Network
  • Lighting System
  • Low Current System Including, CCTV, Fire Alarm, Telephone, Data System, Public address.
  • Firefighting System

Ministry of Youth

Ismailia Youth House Electrical works
  • Infrastructure works for low voltage network including cables
  • Low tension MDB and SMDB and Control Panels.
  • Lighting system, Power distribution system
  • Power Earthing Network, Low Current Earthing Network
  • Low Current System Including, CCTV, Fire Alarm, Telephone, Data
  • System, Public address, Emergency Lighting Network

Dina Farm

Electrical Works (Alex Road)
  • Infrastructure work for medium voltage network (11 KV)
  • Including MV cables, MV overhead Towers, transformers & RMU.
  • Infrastructure works for low voltage network including cables
  • Low tension MDB and SMDB and Control Panels.
  • Three Power Earthing Networks
  • Lighting system, Power distribution system

Casa residential resort

Electrical Infrastructure Works (Beverly Hills 6TH OCTOBER)
  • Infrastructure work for medium voltage network (11 MVA)
  • Including MV cables, transformers & RMU.
  • Infrastructure works for low voltage network including cables
  • Low tension MDB and SMDB.

MANSOURAH University

Access Control
  • Attendance system using finger print.
  • Attendance system using Eye print.


Hospitals' Projects

Ministry of Health

Suez health insurance hospital
  • Low voltage network including cables, Low tension MDB and SMDB and
  • Control Panels
  • Lighting and Emergency light systems
  • Power Earthing Network, Low Current Earthing Network
  • Low Current System Including, CCTV, Fire Alarm, Telephone and Nursery Calling System

Anglo American

Panels and Cabling
  • upgrading for ICU panels and cables
  • upgrading operation panels and cables
  • upgrading of clinic panels and cables